Successful Biomass Conversion Project for a Leading Tyre Manufacturer based in Meerut (Uttar Pradesh)

The Commission for Air Quality Management in National Capital Region and Adjoining Areas, in its directive dated 2nd June 2022, mandated the switchover of coal-fired boilers to either PNG or Biomass, with the critical condition of achieving SPM levels below 80 mg/NM³, effective from 1st October 2022.

We were entrusted by a reputed Tyre industry major to collaborate on this transition — converting their coal-fired boiler to a biomass-fired system.

Biomass Conversion Project

As part of this journey, we successfully:

  • Executed a complete switchover to biomass
  • Tuned combustion systems to handle multiple biomass types effectively
  • Trained plant operating staff on combustion theory and its real-world application
  • Audited and refurbished the Electrostatic Precipitator (ESP), including internal and rapping arrangements
  • Achieved SPM levels significantly below the 80 mg/NM³ limit, ensuring full compliance
  • Conducted extensive trials and analysis of various biomass fuels
  • Delivered end-to-end support including tuning, testing, and training

This achievement not only ensures statutory compliance but also contributes meaningfully to the cause of cleaner air and environmental sustainability.

Our Case Studies
Biomass Conversion Project
Biomass Conversion Project

We were entrusted by a reputed Tyre industry major to collaborate on this transition — converting their coal-fired boiler to a biomass-fired system. This achievement not only ensures statutory compliance but also contributes meaningfully to the cause of cleaner air and environmental sustainability.

15 TPH Boiler Revamp
15 TPH Boiler Revamp

The project was successfully commissioned on April 14, 2024, and the system has been running reliably since. The client has expressed their satisfaction with both the performance and professionalism of Enneff demonstrated throughout the project.

30 TPH Multi-Biomass Fired Boiler
30 TPH Multi-Biomass Fired Boiler

This flawless execution was made possible by precise design, meticulous engineering, and the dedicated collaboration between the client team and our experts at Enneff Solutions. With this project, we added another Gold Star client to our portfolio & reaffirmed our commitment to efficient, eco-friendly, and future-ready boiler technology.

Flue Gas Heat Recovery Using Air Preheater

This heat recovery intervention showcases our commitment to energy optimization, cost-effectiveness, and sustainability in industrial utility systems. We continue to innovate with performance-focused solutions that deliver measurable value and environmental impact.